Sunday, May 01, 2011

Bathroom rebuild

The two day job turned into a five day job, and I just finished putting the grout into the tile surrounding the window.  Not only did the previous dipstick use drywall instead of moisture resistant backing, but this house is so old and has settled so much that there isn't a straight line in the building.  Period.  So the window is a little crooked, because we built a square frame and then tried to put it in an unsquare window opening.

Ah well.  That's what we like to call "character" here in Wisconsin.  The important thing is that it works, and it's waterproof.  Which it is.  And it's a hundred times better than what we had when we moved in.

NEXT!

No comments: